Featured Projects
Go Back
We were retained by the builder to design and document the diversion of a Coliban Water reticulation sewer around the site of a proposed extension to the Mirridong Nursing Home.
A substantial portion of the new diversion sewer was constructed using directional drilling. This method of construction was adopted to minimise the risk of disturbance to the foundations of dwellings adjoining the alignment of the diversion sewer.